Quote #1: 236Fee for letter re: new windows would be €150. This would include attending the property to carry out an inspection. Certified data for the new windows would be required.
If a BER is required for the property this would be an additional €150.
@fmhplanning. ( 🚀 Quotes accepted: 1. Replies: 7 . Qualifications:
SEAI Better energy tech advisor, engineer, architect, BER Assessor)